Berth layout studies
COWI performs vessel manoeuvring studies to define dimensions of approach channels and turning basins.
Planning of the berthing head arrangement is based on the vessel range together with loading / unloading requirements. We perform dynamic mooring analyses, including vessel downtime assessment.
Facilities Design
Facilities design includes berth and loading facilities, breakwaters, access trestle and pipe racks / conveyors.
In addition, facilities design encompasses tug berths, construction docks, electrical and mechanical installations, including security features and emergency shutdowns.